All articlesHACCP

How to write a HACCP plan for a central production kitchen

A practical guide to building a HACCP plan for a central production kitchen feeding multiple sites — including chill-chain control and onward distribution.

·11 min read·By TFCG Editorial Team

Define the scope properly

Your HACCP plan starts at goods-in and ends at the point of consumption — including transport and on-site regeneration. Don't draw an artificial line at the dispatch door.

The CCPs that almost always apply

Cook (core temperature/time), chill (8°C in 90 minutes), cold-chain transport, regen (core temperature on serve). Each needs a measurable critical limit and a validated monitoring method.

Documentation that scales

Use one master plan with site-specific annexes for each receiving site. Train named individuals at each site to monitor and record — without this, your CCPs become OPRPs in practice.

Author

TFCG Editorial Team

Food safety practitioners

  • Chartered CIEH members
  • BRCGS Approved Trainers
  • Lead Auditors

Chartered food safety practitioners and former technical managers with hands-on UK manufacturing, catering and retail experience. Every article is technically reviewed before publication.

Need help with this in your business?

Talk to a chartered food safety consultant. Free 30-minute initial consultation.

Book consultation

Related articles